How long does a bathroom renovation take?

  • Melinda Steyn
  • 2 days ago
  • 2 min read



At Glam Bathrooms, we know that bathroom renovations can feel both exciting and overwhelming. One of the most common questions we’re asked is: “How long does a bathroom renovation take?” The answer depends on several factors—such as the size of your bathroom, the complexity of the design, and the scope of the work—but we’re here to break it down for you.

Average Timeframe: 2 to 4 Weeks

Most standard bathroom renovations take between 2 to 4 weeks from start to finish once construction begins. This timeframe covers everything from demolition to the final coat of paint. However, it’s important to understand the full picture, including planning and preparation stages.

The Bathroom Renovation Timeline

Here’s a general timeline to give you an idea of what to expect:

1. Planning & Design: 1–3 Weeks

Before any physical work starts, you’ll need to make decisions about the design, layout, fixtures, tiles, and finishes. At Glam Bathrooms, our bathroom consultant work closely with you to bring your vision to life and help you choose practical yet stylish options that suit your lifestyle.

2. Product Ordering & Lead Time: 1–4 Weeks

Depending on your selected materials and fixtures, some items may need to be ordered in. But standard fixtures can be sourced within 2-7 days. Custom vanities, specialty tiles, or imported fittings can take longer to arrive. We always recommend factoring this into your schedule, especially for high-end or bespoke designs.

3. Demolition: 1–2 Days

Out with the old! Demolition is usually quick but can uncover surprises—like water damage or plumbing issues—that may extend the timeline.

4. Plumbing & Electrical: 2–4 Days

Once everything is stripped back, plumbers and electricians install or reconfigure the basic systems behind the walls. This step must be completed and approved before moving on.

5. Structural Work (if needed): Varies

If your renovation includes moving walls or replacing gib or adjusting the floor plan, allow extra time for any structural changes.

6. Tiling, Waterproofing & Plastering: 4–7 Days

These are highly detailed and essential stages. Waterproofing requires drying time, and tiling demands precision. Rushing here isn’t an option—it’s what protects your bathroom for years to come.

7. Fixture & Fitting Installation: 1–2 Days

Your new vanity, toilet, shower screen, bath, and tapware are installed. This stage transforms the space into a functioning bathroom again.

8. Painting, Finishing Touches & Clean-Up: 1–3 Days

A final coat of paint, silicone sealing, and attention to the finer details bring the room together. Once cleaned and polished, it’s ready for you to enjoy.

Factors That Can Affect the Timeline

  • Permit Approvals: Some renovations may require council approval, which can add time.

  • Custom or High-End Fixtures: Specialty items often have longer lead times.

  • Unexpected Repairs: Hidden plumbing or structural issues can cause delays.

  • Size & Complexity: A small powder room remodel will be faster than a large master ensuite transformation.

How Glam Bathrooms Keeps Your Renovation on Track

At Glam Bathrooms, we pride ourselves on delivering high-quality renovations on time and on budget. We provide a clear schedule from the outset and keep you informed every step of the way. Our experienced project managers coordinate all trades and deliveries, ensuring your bathroom renovation runs smoothly and with minimal disruption to your home.

 
 
 